toggle
2023-06-29

(Long lead time)BMW ICOM family

Spread the love

BMW純正部品・アクセサリーのご用命はメールか弊社ECサイトSTORESショップhttps://wright-company.stores.jpからお問い合わせ下さい。

#BMW #ICOM

未だに世界中で取り合いが起きているためいつ入荷するか分かりませんが、オーダーの列に並ばないと決して順番は回ってきません。EUR-JPYレートも気になりますが、値段じゃなくなってきています。

DesignationDescription
ICOM Next AVehicle interface for diagnosis and programming, Basic device. Successor of ICOM A2, compatible with ICOM B, C, D, E and ICOM Next B, C, D. OBD cable included.
ICOM Next BSuccessor of ICOM B (MOST Adapter). Comes with USB cable to ICOM Next A.
ICOM Next CSuccessor of ICOM C. Adapter to older BMW diagnosis connector.
ICOM Next DAdapter cable for the round 10-pin diagnostic connector. Successor model to the ICOM D adapter cables. Compatible with the ICOM A, ICOM A2 and ICOM Next A basic units.
ICOM EAdapter cable for older motorcycles with the 3-pin diagnostic connector. Compatible with the ICOM A, ICOM A2 and ICOM Next A basic devices
ICOM Next A OBD cableSpare cable only for ICOM Next A, 140 cm long.
ICOM A2 OBD Cable 140cmReplacement cable only for ICOM A2, version 140 cm long for passenger cars.
ICOM OBD Extension Cable (Omitec)

   

 

関連記事
%d人のブロガーが「いいね」をつけました。